A freshly finished home with cement film clouding the window glass, paint splatter streaked across the tile, and construction dust settled into every corner isn’t a job for a regular house clean. It takes a team with the right equipment and specialized chemicals to clear it all away without damaging surfaces that were just installed.

Sai Gon Home Repair 247 provides post-construction cleaning services in Ho Chi Minh City and neighboring provinces. More than 10 years of experience, thousands of projects delivered — from apartments and townhouses to villas and offices.
Hotline/Zalo: 0707 759 247 — Free quote within 15 minutes.
1. What Is Post-Construction Cleaning, and How Is It Different From a Regular House Clean?
Post-construction cleaning is a deep-cleaning process that removes the specific types of residue left behind during construction — cement, mortar, paint splatter, silicone adhesive, and construction dust — using industrial equipment and specialized chemicals.
| Criteria | Regular House Cleaning | Post-Construction Cleaning |
|---|---|---|
| Type of residue handled | Household dust, everyday stains | Cement, paint, adhesive, construction dust |
| Equipment | Broom, hand mop | Industrial vacuum, floor scrubber machine |
| Chemicals | Household floor cleaner | Cement remover, paint remover, adhesive remover |
| Duration | 2–4 hours | 1–3 days depending on floor area |
| Result | Surface-level clean | Deep clean, safe to move in immediately |
There are two common types of projects that need professional cleaning: brand-new construction (heavy cement dust, sand, and widespread paint splatter) and renovated/repaired homes (more localized dirt, with a need to protect existing furniture and finishes).
2. Why Clean Immediately After Construction?
Many homeowners think they can wait a few weeks and clean it themselves. In reality, delaying leads to higher costs and a real risk of material damage.
Health: Cement dust contains crystalline silica, which can damage the lungs with prolonged inhalation. Paint dust contains VOCs (volatile organic compounds) that can cause headaches and respiratory irritation — especially risky for children and pregnant women.
Materials: Cement residue on glass, ceramic tile, and stainless steel hardens completely if left for more than 7–14 days. At that point, it requires much stronger chemicals or mechanical scraping, which can easily scratch the surface. The cost of treatment can rise 2–3 times compared to handling it right away.
Furniture and finishes: Construction sand and dust are considerably harder than everyday household dust. If it isn’t vacuumed up before furniture is moved in, it will scratch wood and stone flooring as items are moved across it.

3. The Standard 10-Step Post-Construction Cleaning Process
Step 1: Site survey and planning
A technician visits the site to assess the floor area, the type of floor/wall/glass materials, the level of dirt, and any spots that need special treatment. A checklist is drawn up assigning the crew and the right chemicals for each area.
This is the most important step, and one many providers skip. Without an on-site survey, using the wrong chemical can scratch glass, dull tile finish, or fade stone color — damage that can’t be undone.
Step 2: Collecting construction debris and waste
Removing broken tile, cement bags, paint cans, and leftover materials. Waste is sorted for proper disposal, keeping construction debris separate from household waste to avoid complicating the disposal process.
Step 3: Dry vacuuming from top to bottom
An industrial vacuum (with a HEPA filter) clears the ceiling, walls, and window frames in order, from top to bottom. This step must be done before wetting any surface.
Why: wetting construction dust right away turns it into mud — three times harder to clean and leaves a film on the surface once it dries.
Step 4: Soaking chemicals to break down stubborn residue
Each type of stain is identified and treated with a targeted approach:
- Cement residue on glass, tile, or stainless steel: a mild acid solution (diluted HCl at the correct ratio), soaked for 5–15 minutes depending on severity
- Paint splatter: a paint-remover solvent matched to the paint type (water-based paint requires a different solvent than oil-based paint)
- Silicone adhesive residue: a 30-degree angled scraper combined with a specialized adhesive remover
- Yellowed grout lines: a grout-whitening chemical, soaked and scrubbed with a stiff-bristle brush

Step 5: Cleaning the ceiling and walls
Wiping down drywall ceilings, cleaning light fixtures, fans, and ventilation grilles in detail. Removing paint and dust from the walls, working top to bottom to make sure dirt doesn’t fall back onto areas already cleaned below.
Step 6: Cleaning doors and glass
Both sides of the glass are cleaned with a specialized solution that leaves no streaks. Aluminum frames, door profiles, latches, and hinges are cleaned thoroughly. Cement residue on aluminum surfaces is removed with the correct chemical — never scraped off with a hard tool, which can damage the aluminum profile.
Step 7: Scrubbing floors and cleaning grout lines
Floors are scrubbed with a single-disc machine combined with a cement-remover solution. Grout lines are cleaned with a specialized brush and grout-whitening chemical, line by line. Rinsed thoroughly with water, then extracted with an industrial water vacuum — never a hand mop, which tends to spread the dirt around instead of removing it.
Step 8: Cleaning bathrooms and kitchens
Bathroom areas: removing calcium buildup from toilets, sinks, faucets, and mirrors with a mild acid solution. Kitchen areas: degreasing surfaces, cleaning stone countertops, stainless steel sinks, and cabinet glass.
Step 9: Paint odor removal (optional)
Activated charcoal is placed, or a specialized odor-neutralizing solution is sprayed, in freshly painted rooms. Especially recommended for households with young children, pregnant women, or elderly residents.
Step 10: Final inspection, photo documentation, and checklist handover
Every area is checked against a standard checklist, and photos are taken of the entire finished site. The customer inspects each item and signs off. We commit to redoing any spot free of charge within 24 hours if something falls short.
4. Equipment and Chemicals Used
Sai Gon Home Repair 247 invests in specialized equipment — no manual tools are used for post-construction cleaning work.
Main equipment:
- Industrial vacuum cleaner (HEPA filter) — captures fine dust without releasing it back into the air
- Industrial wet vacuum — clears the floor after scrubbing and rinsing
- Single-disc floor scrubber — for tile, stone, and cement floors
- High-pressure washer — for outdoor areas, yards, gates, and balconies
- Professional glass-cleaning tools (extension poles, specialized squeegees)
Chemicals used (all with full MSDS documentation, safe for use):
- Cement-remover solution (mild acid) for tile, stone, and stainless steel
- Paint-remover solvents for both water-based and oil-based paint
- Silicone adhesive remover
- Grout-whitening chemical
- Calcium-deposit remover for bathroom fixtures
- Specialized paint odor neutralizer

5. 2026 Post-Construction Cleaning Price List
Sai Gon Home Repair 247 publishes a reference price list — the exact price is quoted after an on-site survey, with no hidden costs added once the contract is signed.
| Property Type | Condition | Reference Price |
|---|---|---|
| 1–2 bedroom apartment | Empty, light dust | 700,000 – 1,000,000 VND |
| 1–2 bedroom apartment | Heavy dust / furnished | 1,000,000 – 1,400,000 VND |
| 3-bedroom apartment | Empty | 1,200,000 – 1,600,000 VND |
| Single-story house | Full package | 600,000 – 1,200,000 VND |
| Townhouse, 1 ground floor + 1 upper floor | Full package | 1,400,000 – 1,800,000 VND |
| Townhouse, 1 ground floor + 2 upper floors | Full package | 1,800,000 – 2,500,000 VND |
| Townhouse, 1 ground floor + 2 upper floors + rooftop terrace | Full package | 2,200,000 – 2,800,000 VND |
| Office | Priced by floor area | 10,000 – 16,000 VND/m² |
| Villa | Priced after site survey | Contact for a quote |
Factors affecting the actual price: floor area, level of dirt, property type, whether it’s furnished, and location (inner city, outskirts, or neighboring province).
6. How to Choose a Reliable Post-Construction Cleaning Company
Before signing a contract, customers should ask these 6 questions:
- Do they survey the site in person before quoting?
- Do the chemicals used come with full safety data sheets (MSDS)?
- Is there a warranty on the results after handover?
- Do they commit to redoing the work free of charge if it falls short?
- Do they take before/after photos for comparison?
- Do the workers wear uniforms, name badges, and have verified backgrounds?
Three warning signs of an unreliable provider:
- Quoting a price over the phone with no actual site survey
- Unable to provide a list of the chemicals they use
- No clear warranty policy or complaint-handling process

7. Frequently Asked Questions
1. How long does post-construction cleaning take?
A 60–80 m² apartment, empty and lightly dusty: 4–6 hours. A 2–3 story townhouse, fully finished: 1–2 days. A large villa or a project with heavy cement/paint residue: 2–3 days. The exact timeframe is confirmed after an on-site survey.
2. Do I need to remove furniture before cleaning?
Not if the space is unfurnished. If furniture is already in place, the crew will carefully cover and protect it and clean around it. It’s recommended to move smaller items out of the way so the crew can work more efficiently.
3. Is the cement-remover chemical harmful to health?
Our specialized chemicals all come with MSDS documentation and are safe when used correctly with proper protective gear. After the work is done, surfaces are rinsed thoroughly with water multiple times. You can move in as soon as the floor is dry.
4. Can I move in right after the cleaning?
For standard cleaning: yes, as soon as the floor is dry (1–2 hours). If odor treatment for fresh paint was done: it’s best to ventilate the room for another 2–4 hours before sleeping in it.
5. Can you clean a home that’s already lived in?
Yes. Sai Gon Home Repair 247 also handles full cleaning for occupied homes, active offices, and post-event cleanup — not just newly built properties.
6. Do you serve neighboring provinces?
Yes. Sai Gon Home Repair 247 takes on projects in Ho Chi Minh City, Binh Duong, Dong Nai, Long An, and Ba Ria–Vung Tau. Travel fees are calculated based on distance and communicated clearly when you contact us.
8. Book Your Post-Construction Cleaning
Our commitment:
- Free on-site survey — no charge if you decide not to sign a contract
- Detailed quote within 15 minutes via Zalo
- Uniformed staff with name badges and verified backgrounds
- Chemicals with full MSDS documentation, safe for health
- Before/after photos, handover with a checklist
- Free re-cleaning within 24 hours if something falls short
Our 4-step booking process:
- Call or message us on Zalo
- Tell us the property type, approximate floor area, and address
- A technician visits for a free survey and gives you a detailed on-site quote
- Confirm your booking — our crew arrives on time and hands over a clean home
Hotline: 0707 759 247
English support: 033 939 0325
English & Korean support: 076 806 7114
Email: snsaigon247@gmail.com
Address: No. 150 Tran Nao Street, KP.2, An Khanh Ward, Ho Chi Minh City
Working Hours: 8:00 AM – 5:00 PM daily | Hotline available 24/7
Tiếng Việt


