- Agree the scope by the actual surfaces. List the walls, ceilings and each area to be painted, and separate repainting from floor repairs or moisture treatment.
- Count the time the office cannot be used. The schedule needs to allow for masking, surface preparation, drying between coats, ventilation, cleaning and reopening each area.
- Compare quotes against the acceptance criteria. For the same floor area, two offers can differ in the number of coats, the level of surface preparation, furniture moving and the warranty scope.
What does an office painting package include?
An office painting package is a scope of work agreed after the survey. It usually covers site preparation, surface treatment according to the actual condition, application of the approved paint system, and handover. A paint system is the combination of layers used on one surface, for example a compatible primer and a coloured topcoat. The quote should state which materials and labour are inside the package, which items are charged separately, and who is responsible for each part.
For a newly leased office, check the floor against the furniture layout drawing. Partitions that will be removed, or places where cabling is still to be run, can be sequenced so the work is not done twice. For an office that is still operating, decide which rooms must stay open every day, where equipment is hard to move, and when floor-level preparation is allowed. If you are preparing to hand the space back, use the restoration requirements agreed with the landlord to define the colour, the scope and the finish level.
An interior painting package can include work areas, corridors, meeting rooms, the lobby or the pantry. List surfaces such as metal doors, wood partitions, special ceilings or exterior areas separately, so the contractor can choose suitable materials. If you want to see a wider painting and repair scope, you can look at the house painting services in Ho Chi Minh City from Sai Gon Home Repair 247.

Choosing an approach based on wall and ceiling condition and your working schedule
During the survey, walk the site with the contractor and mark every area that shows peeling, chalking, screw holes, cracks or stains. Sorting them on site lets whoever approves the budget see which work is only a colour change and which work must be repaired before painting. For stains that keep coming back, note when they appear and how they relate to windows, water pipes or cooling equipment, so the area to be inspected can be narrowed down.
| Option | When it fits | What to agree before approving |
|---|---|---|
| Repaint over a sound surface | The old coating is firmly bonded and the main aim is a new colour or a better-looking surface. | Record the cleaning step, the extent of touch-up repairs, the paint system suited to the existing surface and the approved colour sample. |
| Repair the surface, then repaint | There are many screw holes, flaking areas, patches or uneven sections. | Mark the area to be scraped or skim-coated. Agree how the joins between patches and the old wall will be handled. |
| Treat the cause of moisture before finishing | Stains return, walls show signs of lasting damp, or a leak is suspected. | Name who will inspect the moisture source, how it will be confirmed that the surface is ready for paint, and the handover condition for each item. |
| Paint by area or by shift | The business must keep part of the office running or has limited working hours. | Agree the order in which rooms close and reopen, how dust is contained, the delivery route, the ventilation time and who confirms an area can reopen. |
The options can be combined. Hypothetical example. An office that is still working wants a new colour in the reception area and a repair of a stained ceiling patch near an air conditioner. The reception area can be scheduled within the permitted working hours. The ceiling patch should be inspected first, for example to see whether the stain is related to the air conditioner’s condensate line or to another source of moisture. The two parts may start under different conditions even though they sit in the same renovation plan.
Reading an office painting quote and comparing suppliers
Check quantities and specifications
Floor area describes the rough size of the job at the start, but paint quantities depend on the surfaces actually being painted. For the same floor area, an office with many partitions or high ceilings can have different quantities from an open floor plan. Ask for how walls, ceilings and columns are measured, how doors are deducted, and which sides of each partition are included. Work measured in other units, such as treating a stretch of joint, should have its own calculation method.
On materials, compare the product line, colour code, gloss level, primer where needed and the number of coats under the agreed option. A topcoat is the visible finishing layer. A primer prepares the surface for the topcoat within a suitable product system. Skim coat is a step that uses a levelling material on areas that need repair. If the quote includes skim coating, ask whether it is spot filling at damaged points or a full-surface coat, because the quantities and inspection conditions are different.
For corridors or surfaces that people touch often, you can give preference to paints with cleaning guidance that suits how your business cleans. In meeting rooms or the lobby, approve a sample on the actual wall under the lighting used in practice. The sample should show both colour and gloss. Record the colour code, the product and the location where it was approved, so the same reference is used at handover or for later touch-ups.

Check ancillary items and how variations are approved
Ask about floor protection, covering of furniture, moving or refitting furniture, transport of materials, cleaning, waste removal and tax where it applies. For an office inside a building, check who registers workers and deliveries, who arranges the freight lift, and which fees or deposits are paid by which party if building management requires them. The actual cost is confirmed after the survey, once the scope of work has been agreed.
To compare suppliers, send every party the same list of areas, finish requirements and time windows. After you receive the quotes, mark each item with one of three statuses: included, charged separately, needs confirmation. If one supplier writes full-surface preparation and another only spot repairs, ask for the reason based on the actual condition before you put the two totals side by side. That way the approver can see whether the difference comes from the method, the materials or the working conditions.
Confirm in writing how additional work will be handled. If damage is found after the old coating is removed, the contractor should describe the location, propose a treatment and state the effect on cost and schedule. Name a person who has the authority to approve, so the crew knows when it can continue. For item-level warranties, ask for the scope, the period, the conditions for accepting a claim and the contact person to be written in the project file.
If you have a fixed opening date or a set date for moving desks, ask for a quote with a room-by-room schedule. Write down separately the hours when crews may enter the building, the time when dust-generating work ends, and the inspection milestone before a room reopens. A schedule that only gives a start date and an end date is hard to use for coordinating staff while the work is under way.
The process from survey to handover at Sai Gon Home Repair 247
Sai Gon Home Repair 247 has more than 7 years of experience in repair, renovation and interior fit-out, with a permanent crew and item-level warranties as agreed. The company also carries out waterproofing, plumbing and electrical work, air conditioning and interior finishing. When painting depends on another repair item, you can request a joint survey and have the scope and sequence of each job written separately.
- Send the information to book a survey. Provide the address, photos of the whole room and close-ups of damaged spots, the list of areas to be painted and the date by which the office must be back in use. If there are rules about freight lifts, noise or working hours, send them too so the plan fits the real conditions.
- Walk the site together. Go room by room with the contractor to confirm what is to be painted, what stays as it is, where protection is needed and which surfaces need treatment. Note separately places you could not fully see, such as an area hidden behind a cabinet. For areas with important equipment or documents, name the person responsible for moving them and handing the area over.
- Approve the quote and the schedule. Sai Gon Home Repair 247 gives a quote before work starts. When you approve it, check the scope against the survey results, the colour samples, the product information and the handover milestone for each area. If you need work after hours or at weekends, confirm with the crew and the building management whether this can be arranged for your project.
- Check the milestones before moving to the next step. Before painting, check the masking and the places where surface treatment will be covered by the topcoat. Ask for work to follow the instructions of the approved product, including surface conditions and the waiting time between coats. When working in shifts, confirm which area can be used in the next shift based on its actual condition and the ventilation plan.
- Accept the work room by room. Compare colour and gloss with the approved sample under the lighting used in practice. Check evenness, runs, missed spots and the lines where paint meets trims, doors and ceilings. Confirm the condition of the floor and furniture after the protection is removed. If a correction is needed, record the location, the work to be done and the date of the re-check in the handover record.
At handover, keep the colour-code table by room, the product names, the acceptance record and the warranty terms. This file lets the facilities manager look up exactly which materials were used when planning maintenance, and shows which item to raise with the contractor if a problem appears on a surface.

Frequently asked questions
Can I get a quote from photos before a survey?
Photos, a floor plan and a list of rooms help the supplier understand your initial needs and point out what needs further inspection. When you send photos, label the room, mark the areas to be painted and, if there are stains, describe when they appeared. A final quote has to rest on quantities and conditions confirmed on site, especially where photos cannot show how well the old paint is bonded or whether there are signs of moisture.
Can a few touched-up spots match the existing wall colour?
It can be tried in a spot that is not very visible if the product and the original colour code are still known. A wall colour that has been in use, and the gloss of the touched-up spot, can differ from the surrounding paint. Look at a sample after it dries under the room’s own lighting. If the boundary is still easy to see, you can ask for a separate option to repaint the whole wall section up to a corner or trim line, which makes evenness easier to control.
When can staff go back into a room after painting?
The timing depends on the product, the ventilation and the actual condition. Ask the supplier to state the conditions for reopening a room according to the product’s usage instructions and the agreed ventilation plan. Schedule the return of people and equipment after the area has been cleaned, inspected and confirmed fit for use. If furniture needs to go against the wall, or the surface needs to be washed, ask separately when each can be done.
Can we discuss the survey requirements in English or Korean?
Yes. Sai Gon Home Repair 247 supports English and Korean on +84 76 806 7114, and English on +84 33 939 0325. When you book, say which language you prefer and who will join the survey or approve the work. If your company needs bilingual documents, state which documents are required so both sides can confirm them in advance.
Book an office painting survey in Ho Chi Minh City
Contact Sai Gon Home Repair 247 for an on-site survey and a solution that fits your office. Send the office address, the areas to be painted and the date you expect to use the space again. If the building has its own construction rules, send them too so both sides can discuss the plan and the schedule from the start.
- English and Korean support +84 76 806 7114 (call or Zalo). English support +84 33 939 0325 (call or Zalo).
- Email snsaigon247@gmail.com. You can also message us on Messenger, WeChat or KakaoTalk.
- Address 150 Tran Nao Street, Quarter 2, An Khanh Ward, Ho Chi Minh City.
- Office hours Monday to Saturday, 08:00–17:30. Tax code 0315990230.